Seri Saujana Bridge
This bridge is the link between the Core Island (Presint 4) and Presint 7. Seri Saujana Bridge is strategically located at the main entrance into the Core Island from the south via the upgraded B15 road and KL-KLIA highway.
It is a new concept of the cable stayed Arch bridge. The bridge is controlled by the principal design parameters to reflect a transparent elegant and futuristic slender looking structure, with an overall single span of 300m and total width of 32m. There are dual three lane carriageways. The deck level varies from RL 35.25m at abutment to RL 35m at centre of the bridge.
It is a new concept of the cable-stayed arch bridge. The bridge is controlled by the principal design parameters to reflect a transparent, elegant and futuristic slender looking structure, with an overall single span of 300m and total width of 32m. There are dual three lane carriageways. The deck level varies from RL 35.25m at abutment to RL 35m at centre of the bridge.
The builder of this bridge was Road Builder (M) Sdn Bhd at a cost of USD20 million. It was completed on 31st May 2003.
Contact
Putrajaya Holdings Sdn Bhd ,
Blok 1, Menara PjH,
No. 2, Persiaran Perdana, Presint 2,
62100 Putrajaya, Malaysia.
Tel: 603 - 8883 8888
Fax: 603 - 8889 5499
Corporate Website: http://www.pjh.com.my
Putrajaya Community Web Portal: http://www.i-putra.com.my
It is a new concept of the cable stayed Arch bridge. The bridge is controlled by the principal design parameters to reflect a transparent elegant and futuristic slender looking structure, with an overall single span of 300m and total width of 32m. There are dual three lane carriageways. The deck level varies from RL 35.25m at abutment to RL 35m at centre of the bridge.
It is a new concept of the cable-stayed arch bridge. The bridge is controlled by the principal design parameters to reflect a transparent, elegant and futuristic slender looking structure, with an overall single span of 300m and total width of 32m. There are dual three lane carriageways. The deck level varies from RL 35.25m at abutment to RL 35m at centre of the bridge.
The builder of this bridge was Road Builder (M) Sdn Bhd at a cost of USD20 million. It was completed on 31st May 2003.
Contact
Putrajaya Holdings Sdn Bhd ,
Blok 1, Menara PjH,
No. 2, Persiaran Perdana, Presint 2,
62100 Putrajaya, Malaysia.
Tel: 603 - 8883 8888
Fax: 603 - 8889 5499
Corporate Website: http://www.pjh.com.my
Putrajaya Community Web Portal: http://www.i-putra.com.my
0 Response to "Seri Saujana Bridge"